
Home/Industrial Access Scaffolding
JEL-SEWA, Al Layyah Project
A full access solution engineered around live storage tanks at the Al Layyah works — erected and dismantled to strict HSE standards without interrupting operations.

Overview
A live works, kept running.
SAS delivered full access scaffolding around a cluster of live storage tanks at the Al Layyah works — designed to wrap the curved tank shells and give safe working access at every level for inspection, preparation and coating. The programme was sequenced around ongoing operations so the facility never had to stop.
Access was erected and dismantled to strict HSE standards on a live industrial site, with independent stair towers for egress and a bespoke design proving each configuration before it was built.
Scaffolding & access delivered
System Scaffold
SASLOK modular decks wrapped around the curved tank shells.
Tube & Fitting
Bespoke frameworks shaped to the tanks' irregular geometry.
Access Staircases
Independent stair towers for safe egress at every level.
Bespoke Design
3D/2D drawings and calculations to UAE regs & BS EN 12811-1.
Project Gallery
More Projects

Get Started
Elevate your vision, elevate your space.
Contact us today and let us redefine what’s possible for your project.
Get a Quote